Powering on sequence
1 Power on of all the server UPS units
2 Server startup
The server OS startup is suspended until the
ETERNUS AF startup is complete (*1).
3 Issuance of command to turn on the ETERNUS AF from the power synchronized unit
4 ETERNUS AF startup
*1: The server must be set to suspend server OS startup until the ETERNUS AF startup is complete.
Powering off sequence
1 Shutdown of all the servers
2 Shutdown of all the server UPS units
3 Issuance of command to turn off the
ETERNUS AF from the power synchronized unit
4 ETERNUS AF shutdown
2. Connection Configuration
Power Synchronized Connections
146
FUJITSU Storage ETERNUS AF250 S2, ETERNUS AF250 All-Flash Arrays
Design Guide (Basic)
Copyright 2019 FUJITSU LIMITED
P3AG-1822-09ENZ0

Table of Contents

Other manuals for Fujitsu ETERNUS AF250 S2

Related product manuals