List of Figures
Figure 1 System Configuration Example.................................................................................................................23
Figure 2 Network Setting Label..............................................................................................................................25
Figure 3 ETERNUS DX100 S5/DX200 S5 Rear View of a Controller (Reference)........................................................48
Figure 4 Connecting Cables between Enclosures (When Only One Controller Is Installed) .....................................50
Figure 5 Connecting Cables between Enclosures (When Two Controllers Are Installed) .........................................51
Figure 6 Administration Terminal Connection for Initial Setup...............................................................................56
Figure 7 Example of Creating Operation Volume and Backup Volume ...................................................................66
Figure 8 ON Position (Marked "|") of the Main Line Switches on a 1U Power Distribution Unit ..............................67
Figure 9 ON Position (Marked "|") of the Main Line Switches on a 2U Power Distribution Unit ..............................67
Figure 10 ON Position (Marked "|") of the PSU Switch on a Power Supply Unit ........................................................68
Figure 11 RAID Group Creation...............................................................................................................................109
Figure 12 Operation Volume Creation ....................................................................................................................112
Figure 13 Generation Management Volume (SDV) Creation ..................................................................................117
Figure 14 Copy Data Destination Volume (SDPV) Creation.....................................................................................118
Figure 15 Solution โ Continuous Business (Copy between ETERNUS DX Storage Systems).....................................187
Figure 16 Solution โ Continuous Business (Storage Cluster) ..................................................................................189
Figure 17 Solution โ Automated Storage Tiering....................................................................................................190
Figure 18 Solution โ Performance/Tuning ..............................................................................................................192
Figure 19 Solution โ Green.....................................................................................................................................193
Figure 20 Solution โ Virtualization Platform (Oracle VM Linkage)..........................................................................195
Figure 21 Solution โ Virtualization Platform (VMware Linkage).............................................................................196
Figure 22 Solution โ Virtualization Platform (Veeam Storage Integration) ............................................................198
Figure 23 Solution โ Virtualization Platform (Microsoft Linkage)...........................................................................201
Figure 24 Front View of a Frontend Enclosure (with a Front Cover)........................................................................204
Figure 25 Front View of a Frontend Enclosure (without a Front Cover)...................................................................205
Figure 26 Rear View of a Frontend Enclosure .........................................................................................................206
Figure 27 System Operation Panel.........................................................................................................................207
Figure 28 Message Format of the LCD Panel (during Startup)................................................................................208
Figure 29 Message Format of the LCD Panel (While Running) ...............................................................................209
Figure 30 Service Controller ...................................................................................................................................210
Figure 31 Power Supply Unit (Frontend Enclosure) ................................................................................................211
Figure 32 Frontend Routers....................................................................................................................................211
Figure 33 Front View of a 2.5" Type Controller Enclosure (ETERNUS DX60 S5/DX100 S5/DX200 S5)........................216
Figure 34 Front View of a 3.5" Type Controller Enclosure (ETERNUS DX60 S5/DX100 S5/DX200 S5)........................216
Figure 35 Front View of a Controller Enclosure (for the ETERNUS DX500 S5/DX600 S5, with a Front Cover) ...........217
Figure 36 Front View of a Controller Enclosure (for the ETERNUS DX500 S5/DX600 S5, without a Front Cover) ......217
Figure 37 Front View of a Controller Enclosure (for ETERNUS DX900 S5, with a Front Cover)..................................218
Figure 38 Front View of a Controller Enclosure (for ETERNUS DX900 S5, without a Front Cover) ............................218
Figure 39 Rear View of a Controller Enclosure (When the ETERNUS DX60 S5 Is installed with Only One
Controller)..............................................................................................................................................219
Figure 40 Rear View of a Controller Enclosure (When the ETERNUS DX60 S5 Is Installed with Two Controllers)......219
Figure 41 Rear View of a Controller Enclosure (When the ETERNUS DX100 S5/DX200 S5 Is Installed with
Only One Controller)...............................................................................................................................221
6 Configuration Guide (Basic)