Chapter 3 Initial Setup
3.1 Initial Setup 1
FUJITSU Storage ETERNUS DX Configuration Guide (Web GUI)
Copyright 2014 FUJITSU LIMITED P2X0-1250-06ENZ0
30
5 Proceed to [Set Thin Provisioning].
5-1 Specify the parameters.
The main setting items are as follows.
- Thin Provisioning (Enable/Disable)
- Maximum Pool Capacity
5-2 Click the [Next >>] button.
A confirmation screen appears.
5-3 Click the [OK] button.
The Thin Provisioning setting starts.
5-4 Click the [Done] button.
Click the [Skip] button to proceed to the next screen without setting.