EasyManua.ls Logo

Fujitsu Eternus DX80 S2 - Page 49

Fujitsu Eternus DX80 S2
147 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Chapter 3 Rack Installation
3.1 Installing Power Distribution Unit (For Regions other than EMEA&I)
ETERNUS DX80 S2/DX90 S2 Disk storage system User’s Guide -Installation-
Copyright 2013 FUJITSU LIMITED P3AM-4832-07ENZ0
49
The four M6 screw positions for the brackets are determined relative to the power distribution unit base
line.
The M6 screws should be inserted in the 1st and 3rd holes above the base line.
3 Install the power distribution unit in the rack.
Fasten the power distribution unit to the bracket with the two M3 screws removed in Step 1.
4 Attach the blank panel to the front side of the rack.
The blank panel should be attached at the same height as the power distribution unit.
End of procedure
Power distribution unit1U
(Rear rack pillars)
Brackets
Base line of
power distribution unit
1st position
(M6 screw)
3rd position
(M6 screw)
1st position
(M6 screw)
3rd position
(M6 screw)
[Left] [Right]
(Rear rack pillars)
M3 screw
M3 screw
(Rear rack pillars)
(Front rack pillars)
Blank panel
Power distribution unit

Table of Contents

Other manuals for Fujitsu Eternus DX80 S2

Related product manuals