EasyManua.ls Logo

Fujitsu Eternus DX80 S2 - Page 59

Fujitsu Eternus DX80 S2
147 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Chapter 3 Rack Installation
3.3 Installing Drive Enclosure
ETERNUS DX80 S2/DX90 S2 Disk storage system User’s Guide -Installation-
Copyright 2013 FUJITSU LIMITED P3AM-4832-07ENZ0
59
Procedure
1 Attach the rack rails to the rack.
â–  For the EMEA&I region
(1) Attach the 2U rack rail to the left rear rack pillar.
The M5 centering screws should be inserted in the 1st and 6th holes above the base line of the drive
enclosure.
(2) Insert the pins of the left slide rail in the 1st and 3rd holes from the bottom of the 2U Bracket.
(3) Secure the left slide rail to the front pillar using the M5 centering screw and M5 pan head screw.
(4) For the right slide rail, insert the pins in the holes of the rear pillar, and secure the other side of the
slide rail to the front pillar in the same way as the left slide rail.
M5 centering screws (10mm)
2U rack rail
M5 centering screw (10mm)
M5 cage nut
M5 pan head screw (10mm)

Table of Contents

Other manuals for Fujitsu Eternus DX80 S2

Related product manuals