Chapter 4 Connecting Cables
4.5 Power Cord Connection
ETERNUS DX80 S2/DX90 S2 Disk storage system User’s Guide -Installation-
Copyright 2013 FUJITSU LIMITED P3AM-4832-07ENZ0
81
4.5.2 When 1U Power Distribution Unit is Installed (For Regions other than EMEA&I)
The following procedure explains how to connect the power cord when a 1U power distribution unit is
installed.
Procedure
1 Remove the power cord clamp from the power distribution unit.
2 Connect the power distribution unit outlets and power supply unit inlets with the power
cords (AC output cables, 3m) provided with the power distribution unit.
The procedures to connect the power supply unit is same as the Step 1 in "4.5.1 When no Power
Distribution Units are Installed" (page 78).
The following figure shows an example of AC output cable connection:
To help with power cord management and prevent incorrect connections, attach labels to the power cords
and make a note of connection origins and destinations.
Each enclosure has two power supply units (PSU#0 and PSU#1). The power cords must be connected
to the inlets of both power supply units.
Power distribution unit
Power cord clamps
Drive Enclosure 1
Controller Enclosure
: Connect between the OUTPUT#1-n of the power distribution unit
and the PSU#1 inlets of the ETERNUS DX Disk storage system
: Connect between the OUTPUT#0-n of the power distribution unit
and the PSU#0 inlets of the ETERNUS DX Disk storage system
Power distribution unit
Outlet
OUTPUT #0-1
Outlet
OUTPUT #0-2
Outlet
OUTPUT #1-2
Outlet
OUTPUT #1-1
PSU#1 Inlet
PSU#1 Inlet
PSU#0 Inlet
PSU#0 Inlet