ETERNUS LT20 S2 25
Installing the Tape Library Rack Mounting the Tape Library
3. Place the right rail (support angle down) from the front into the rack, putting
the positioning tappet into the appropriate hole of the right rear rack post.
4. Compress the spring mounted rail to its length, putting the preloaded screw
head in the lower front lug of the rail from behind into the appropriate hole of
the right front rack post as shown below.
The rail now is positioned between the two rack posts by its spring pressure.
Support the rail with one hand.
Figure 13: Setting in the right rail at the front