ETERNUS LT20 S2 27
Installing the Tape Library Rack Mounting the Tape Library
6. Then fasten the rail on the rear side with two screws with centering washers
as shown below.
Figure 15: Mounted right sliding rail (rear side)
7. Mount the left rail in the same way:
– In PRIMECENTER racks, put the positioning tappet of the left rail into the
appropriate hole of the support bracket which you have mounted on the
left rear rack post.
– Compress the spring mounted rail to its length, putting the preloaded
screw head in the lower front lug of the rail from behind into the appro-
priate hole of the left front rack post.
– Screw on the upper lug of the front rail end to the left front rack post with
one screw with centering washer.
– Screw on the rear rail end to support bracket with two screws with
centering washers as shown below.