EasyManua.ls Logo

Fujitsu SPARC Enterprise M9000 - Page 11

Fujitsu SPARC Enterprise M9000
546 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Contents ix
4.5.3 Main Line Switch Locations 4–27
4.5.3.1 SPARC Enterprise M8000 Server Single-Phase Power
Feed 4–28
4.5.3.2 SPARC Enterprise M8000 Server Single-Phase and Dual
Power Feed 4–29
4.5.3.3 SPARC Enterprise M8000 Server Three-Phase Power
Feed 4–30
4.5.3.4 SPARC Enterprise M9000 Server Single-Phase Power
Feed 4–31
4.5.3.5 SPARC Enterprise M9000 Server Single-Phase and Dual
Power Feed 4–32
4.5.3.6 SPARC Enterprise M9000 Server Three-Phase Power
Feed 4–33
4.6 Emergency Switch-Off 4–34
4.7 Cable Routing of the SPARC Enterprise M8000 Server 4–34
4.7.1 Cable Routing When the External I/O Expansion Unit Mounted
4–34
4.7.1.1 Precautions For Cable Routing 4–35
4.7.1.2 When Three External I/O Expansion Units Mounted
4–37
4.7.1.3 For Server Using Three-phase Power Feed 4–41
4.7.1.4 When One External I/O Expansion Unit Mounted 4–
45
5. Internal Components Access 5–1
5.1 How to Open and Close Doors 5–1
5.2 Corresponding Components and Doors That Can Be Accessed 5–2
5.3 How to Remove a Door 5–3
5.4 How to Remove a Side Panel 5–4
6. Replacement of CPU/Memory Board Unit (CMU), CPU, and DIMM 6–1
6.1 Overview of the CMU 6–1
6.2 CPU Upgrade 6–5

Table of Contents

Related product manuals