- 81 -
Starting-up
OK Not compliant
Quick Start Procedure (see chapter " Commissioning", page 46 and " Controller Menu", page 48)
Close the installation's main circuit breaker (outdoor unit power supply)
6 hours before testing => Preheating of the compressor.
Press the On/O Switch => Initialisation takes several seconds.
Operation of the heating circulation pump.
Venting of the pump PAC (heating).
Bleeding the installation.
Outdoor unit starts after 4 mins.
Con gure Time, Date and Heating circuit, DHW period programs if di erent from the default values.
Con gure the hydraulic circuit.
Adjust the heating gradient.
Adjust the max ow setpoint.
Outdoor unit checks
Operation of fan(s), compressor.
Current measurement.
After several minutes measure the di erence in air temperature.
Check condensation and evaporation pressure/temperature.
Hydraulic unit checks
After 15 mins of operation.
Primary water temp. di erence.
DHW priority (switching of distribution valve).
Operation of heating, boiler backup, etc.
Control (see chapter
" Controller Menu", page 48)
Settings, maintenance, checks.
Program the heating periods.
Adjust the setpoints for the heating circuits if di erent from the default values.
Setpoint display.
Explanations of use
The heat pump is ready for operation !