EasyManua.ls Logo

Furuno 1830 - Page 12

Furuno 1830
66 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Scanner
Unit
Preparation;
After
deciding
the
location
of
the
Scannar
Unit,
preparation
of
the
Scanner
Unit
is
necessary.
Use
the
foUowing
procedure.
1.
O
pen
the
radome
package
carefully.
Remove
the
four
MIO
bolts
together
with
spring
and
flat
washers
on
the
bottom
of
the
radome
base
assembly.
These
bolts,
spring
and
flat
washers
raay
be
discarded,
but
do
not
use
the
bolts
in
step
4.
RADOME
]
-
RADOME
BASE
ASSY,
Fig.3
Preparing
the
Radome
Base
for
Mounting
2.
U
n
bolt
the
four
fixing
bolts
used
to
hold
the
white
radome
cover
to
the
blue
radome
base
and
carefully
lift
the
radome
up.
Remove
the
antenna
stoppers.
This
will
release
the
antenna
from
its
shipping
preparation
position,
and
ailow
it
to
rotate
freely.
Fig-.4
Rcmoving
the
KaUoiiie
Cover
^rvT^nTiCaæ
J_PW
T—SW
A—
M
10
BOLT
Scanner
Unit
Mounting:
The
mounting
surface
must
be
parallel
with
the
ship’s
waterline
and
provided
with
six
holes
whose
dimensions
are
shown
in
Fig.5;
Four
12mm
(1/2")
holes
for
fixing.
one
27mm
(1.1")
hole
for
the
cable
entry,
and
one
20mm
(3/4")
hole
for
the
vent
tube.
There
is
a
vent
tube
on
the
base
of
the
Scanner
Unit
which
should
face
the
stem
direction.
The
unit
is
adjusted
so
that
a
target
echo
returned
from
the
bow
direction
will
be
shown
on
the
(Heading
Marker)
position
on
the
screen.
When
drilUng
holes,
take
care
that
the
holes
are
parallel
with
the
fore
and
aft
line.
In
very
hot
and
huraid
climates,
moisture
may
condense
inside
the
radome,
causing
corrosion.
To
prevent
this,
the
vent
tube
is
fitted.
This
tube
is
deaigned
to
allow
the
radome
to
"breathe"
while
not
allowing
entry
of
water
from
outside
into
the
radome.
Therefore,
make
sure
the
tube
is
kept
free
of
foreign
materiels
and
is
not
pinched
or
kinked.
The
vent
tube
extends
downward
by
27mm
(1.1")
from
the
radome
base.
Ensure
the
vent
tube
extends
downward
before
installing
the
radome.
See
Fig.6.
3.
N
ow
install
the
radome
base
on
the
platform
having
5-lOmm
(l/5"'2/5")
in
thickness.
Find
the
vent
tube
on
the
radome
base.
Next,
position
the
radome
base
so
that
the
vent
tube
faces
the
stem
direction.
This
alignment
should
be
carried
out
as
accurately
as
possible-
8

Related product manuals