EasyManua.ls Logo

Furuno DS-80 - PARTS LOCATION AND LISTS; DISPLAY UNIT PARTS LOCATION; DISTRIBUTION BOX PARTS LOCATION

Furuno DS-80
82 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
23
2.4 Wiring of Terminal Box
Fix the cables with the cable tie at the fixing plate. All cables except the power cable should be
fixed by the clamp with the armor.
Fabrication of TTYCY-2S
(for display unit and digital indicator/distance indicator)
Within 120 mm
20
15
Anticorrosive
sheath
1
2
Remove the shield between the fixing plate
and terminal box.
Armor
Shield
FV2-M4
Fabrication of cable TTYCY-3S
TTYCYS-1
Cut vinyl sheath between armor and shield, and wind shield around armor and then lay cable so
armor is in the cable clamp.
FV2-M4
Armor
within 120
Anticorrosive
Sheath
Wind the shield.

Table of Contents

Other manuals for Furuno DS-80

Related product manuals