13
24 Pass the antenna cable, power cable from switchboard and cables of external equipment
through the cable entrance at the bottom of the console and connect them to appropriate ter-
minal board at the bottom of the console.
Connect the power cable (single phase) from ship’s switchboard for the main unit to TB1 on
the terminal board. Also, connect the power cable (three phase) for the antenna unit of the
FAR-2137S/2837S to TB2 on the terminal board. Connect the power cable from the antenna
unit of the FAR-2137S/2837S to TB3 on the terminal board. Connect the power cable from
the CU-200 to J614 on the TB board. See the installation manual of the FAR-2807/2107 se-
ries for how to connect cables to the TB board.
25 Fasten the transparent cover (removed at step 9) to the TB board with four washer-head
screws (M4×10).
26 Connect LAN cable and signal cable.
1) Connect the signal cable from the monitor unit to the DVI-D MONITOR port (J204) on the processor
unit. Bind it as shown below.
2) Connect LAN cable between the LAN port of the Switching Hub and the NETWORK port of the proces-
sor unit. Connect LAN cable from the CU-200 to the LAN port on the Switching Hub (see the picture at
step 5).
3) If no Switching Hub is installed, connect LAN cable from the CU-200 to the NETWORK port on the pro-
cessor unit.
27 Refasten the top cover of the console (removed at step 5-1)) with six screws (M4×8).
28 For FAR-2137S/2837S, fasten the power supply unit PSU-007 to the console as follows.
For how to attach the PSU-007 when IF-7100 is installed, see step 6 on page 6.
1) Remove the cover of the PSU-007. Fasten the PSU-007 to the mounting plate with four screws
(M5×12).
2) Connect cables as shown below.
J621
J620
J619
J618
J612
J610
J608
J607
J606
J605
J604
J603
J602 J601
J617
J616
TRACK CONT
J655
J615
J614
J622
J609
J611
SERIAL I/F ECDIS
3
2
1
CARD I/F
OPTION
J651 HV
EXT. ALARM AIS
SCANNER
PWR J652
IF Video
AD Conv
LOG
NAVIGATOR
HEADING
PSU
KEY
GC-10 RS-232CKEY
SPU J654
SPU J653
J680
GYROCOMPASS
TB PCB 03P9342
1
2
1
2
3
1
2
3
To scanner
TB3
Ship's mains
TB2
Ship's mains
TB1
OUT
123
U
V
W
IN
123
U
V
W
Cable
Clamp*1
Terminal
Board
Power Supply Terminal Board
TB Board
1
2
HC
To Antenna Unit
for FAR-2137S/
2837S
From Switchboard
(three phase) for
FAR-2137S/2837S
From
Switchboard
(single phase)
Cable Clamp*2
*1: Clamp at armor of cable.
*2: Clamp at shield of cable.
To
PSU-007
NETWORK
port
J204
Processor Unit
Front View
Top View
Band
Signal Cable from
Monitor Unit
a) Coil signal cable three
times and clamp it.
b) Bind it with band.