1. INSTALLATION
1-13
scratches.After the antenna unit is hoisted in place, remove the all shackles
and the lifting fixtures at the upper chassis (A, two places).
Sideways hoisting
The antenna unit is positioned sideways with mast installed etc.
Place the antenna so that the bow side faces upward. Attach two shackles to both
ends of a belt sling, and pass through the stern side of the antenna support as
shown in the figure below. Fasten the shackles to the lifting fixtures (B, two places),
and hoist the chassis.s
For landscape hoisting, the lifting fixtures (A, two places) at the upper chassis are
not used.
After the antenna unit is hoisted in place, remove the all shackles and the lifting fix-
tures at the upper chassis (A, two places), referring to the description in the "Upright
hoisting" on page 1-12.
How to fasten the Antenna Unit to the mounting platform
1. Construct a suitable mounting platform referring to the outline drawing at the back
of this manual.
Note: The mounting platform must be flat, level and firmly secured.
• The diameter of the mast for fixing the Antenna Unit platform must be over 250
mm.
• The thickness of the Antenna Unit platform must be over 15 mm.
Bolt and gasket
Bolt and gasket
Protector
(cloth etc.)
cable
entrance side
Belt sling
10 cm
Remove lifting fixtures.
Note
: If you forget to remove the lifting bracket, water may enter the antenna.
Fasten the bolts tightly.
Lifting fixture
(Remove)
(Torque: 21.0 N•m)
Note: Pass the belt sling
around the
Antenna Support.
Antenna supportAntenna support
Shackle
(left, right)
Shackle
(left, right)
Lifting fixture
(ø20)
Lifting fixture
(ø20)
Bow side UP
Belt slingBelt sling