2. WIRING
2-33
10) Attach the supplied earth label over the earth label currently attached near the
grounding terminal.
Note: If it is necessary to open the front cover after installing the DE-ICER kit,
remove the de-icer power cable from the locking wire saddle shown in the fol-
lowing figure then detach the cover slowly to prevent damage to the heater.
15. Reconnect the performance monitor connector (J807).
16. Check that the gasket on the front and rear cover is seated properly, then close
the covers. The torque for the fixing bolts must be 21.0 N•m.
Note: For the de-icer specifications, take care not to hit the heater elements on
the chassis or radiator. If the heater hits something, unfasten the fixing screws for
the heater to adjust the position of the heater. Then fix the heater again.
2.5 Antenna Unit for S-band, TR-DOWN Radar
2.5.1 How to fabricate the cables
For how to connect the WAGO connector, see "WAGO connector" on page 2-5.
TTYCYSLA-10 (for serial cable)
Earth label
Grounding terminalGrounding terminal
FRONT
Remove the de-icer power cable from the locking
wire saddle to open the front cover.
Remove the de-icer power cable from the locking
wire saddle to open the front cover.
Crimp-on lug
6
6
10
200
390
30
Outer sheath Armor Inner sheath
Pass the heat shrink tubing (local supply)
onto the drain wire.
Drain wire
Vinyl tape
(unit: mm)