EasyManua.ls Logo

Furuno FSV25 - 1.10 Attachment Flange (Option)

Furuno FSV25
88 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
1. HOW TO INSTALL THE SYSTEM
1-17
1.10 Attachment Flange (Option)
When retrofitting a CSH-20 or FSV-24/30/35 hull unit on a steel hull, an attachment
flange must be used. Choose the correct flange from the table below, using the length
of the pre-installed tank to determine the raising height.
When retrofitting CSH or FSV-243E/244E hull units, use the OP10-24 attachment kit.
Attachment kit OP10-24 contents (Code No.: 006-943-530)
1. Clean the flange and O-ring groove of the retraction tank (welded to hull) with ethyl
alcohol moistened waste cloths.
2. Apply lithium grease to the O-ring and O-ring groove. Place the O-ring in its
groove on the tank flange.
3. When using Attachment Kit OP10-24, lay the insulation gaskets (1) on the top of
the tank flange, taking care to align the bolt holes on the gaskets with the bolt
holes on the flange.
4. Confirm the following points as below and place the attachment flange on the
retraction tank.
Clean the flange platform.
Wipe the undersurface of the attachment flange with clean waste cloths.
Keep O-ring in its position.
5. When using Attachment Kit OP10-24, insert the insulation gaskets (2) into the bolt
holes of the tank flange.
Flange type
Raising
height (mm)
OP10-42 150
OP10-38 200
OP10-39 250
OP10-43 280
OP10-44 315
Item Type Code No. Qty
Insulated gaskets (1) MS-1000-67-1 100-347-601-10 24
Insulated gaskets (2) MS-1000-68-1 100-347-611-10 24

Related product manuals