EasyManua.ls Logo

Furuno FV-110 - Chapter 2 Installation; 2.1 Unpacking

Furuno FV-110
240 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2-1
Chapter 2
Installation
2
This chapter is organised in the following sections:
Unpacking
Site preparation
Installation of the ADU
Installation of the ACU
Installation of the VMU
2.1 Unpacking
2.1.1 What’s in the box
ADU
Unpack your FV-110 ADU and check that the following items are present:
ADU with 4 lifting brackets (already mounted)
Package with bolts, washers and cable glands (2 sizes)
ACU
Unpack your FV-110 ACU and check that the following items are present:
1 x Ethernet cable (2 m)
1 x Ethernet cable (short)
Power cable (230 VAC)
2 x 75 Ohm coax cables F-F (1m), for Rx and Tx
NMEA multi-connector
Installation manual

Table of Contents