2-1
Chapter 2
Installation
2
This chapter is organised in the following sections:
• Unpacking
• Site preparation
• Installation of the ADU
• Installation of the ACU
• Installation of the VMU
2.1 Unpacking
2.1.1 What’s in the box
ADU
Unpack your FV-110 ADU and check that the following items are present:
• ADU with 4 lifting brackets (already mounted)
• Package with bolts, washers and cable glands (2 sizes)
ACU
Unpack your FV-110 ACU and check that the following items are present:
• 1 x Ethernet cable (2 m)
• 1 x Ethernet cable (short)
• Power cable (230 VAC)
• 2 x 75 Ohm coax cables F-F (1m), for Rx and Tx
• NMEA multi-connector
• Installation manual