EasyManua.ls Logo

Furuno GP-330B - INSTALLATION; Equipment Lists; Tools & Materials

Furuno GP-330B
52 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
1
1. INSTALLATION
1.1 Equipment Lists
1.2 Tools & Materials
Name Type Code No. Qty Remarks
Standard Supply
GPS Receiver GP-330B 1
Installation Materials
CP20-03200 000-012-581
1
With CAN bus cable (6 m) (A Type)
CP20-03210 000-012-582 No cable (N Type)
CP20-03220 000-037-142 With NMEA0183 cable (10 m)
(B Type)
Optional Supply
Cable Assy. 33-1209-01 001-193-460-10 1 6 m, for CAN bus
Cable Assy. 33-1209-02 001-193-470-10 1 10 m, for CAN bus
Cable Assy. 22-910-03 001-163-140-10 1 10 m, for NMEA 0183
Cable Assy.
MJ-A7SPF/
SRMD-100
000-144-534-11 1
10 m, straight, MJ7P(P)-MJ7P(J),
for NMEA 0183
Flush Mount Kit GP-330B-
FLUSH KIT
001-037-630
1
Deck Mount Kit GP-330B-
DECK KIT
001-037-640
1
Pipe Mount Kit GP-330B-
PIPE KIT
001-041-560 1
Mounting hardware with standard 1-14" UNS (Pole/Rail Mount installation) threads
• Safety goggles
• Dust mask
Screwdrivers (Pole/Rail Mount or Deck Mount installation)
Teflon pipe thread tape, 1/2" wide (some installations)
Pencil (some installations)
Electric drill (some installations)
Drill bits (some installations):
Pilot hole - 3 mm or 1/8"
Deck mount screw holes - 5.1 mm or #7
Deck mount cable hole - 25 mm or 1”
Flush mount stud holes - 6 mm or 1/4”
Flush mount cable hole - 38 mm or 1-1/2”
Loctite 242 or removable thread locker (Flush Mount installation)
Cable ties (some installations)

Related product manuals