EasyManua.ls Logo

Gaggia Babila - Coffee Cycle Sequence

Gaggia Babila
66 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GAGGIA BABILA 04 OPERATING LOGIC
5/11
Notes: * Only with Pre-brewing
4.5. Coee cycle
Switching on
When the machine is switched on, the gearmotor repositions itself as follows:
- It stresses microswitch 1 (see the following chapter)
- The gearmotor changes the rotation direction and moves upwards again by approx. 1-2 mm
- The boiler begins to heat the water for approx. 45 sec. at full power in order to
reach the optimal temperature. The temperature will then remain constant.
Coee cycle
1. The coee grinder starts the grinding process (controlled by pulses generated by a sensor)
2. The gearmotor (coee unit) moves to the dispensing position
3. Preliminary dispensing phase (short pump activity, short pause)
4. The product is dispensed (the pump operation time depends on the amount of product
dispensed)
5. The gearmotor moves to the idle position (the dregs are expelled automatically)
Main Switch
ON
START STOP
Time
Coee grinder
Heating
Pump
Gearmotor
Brewing unit
Status Heating Ready Coee cycle
Pulses
(Dosage)
Pump action
(ow meter pulses)
depending on
the quantity of the
product set
approx.45 sec.
*
Single microswitch gearmotor
OFF
ON
MicroSwitch
Status

Related product manuals