EasyManua.ls Logo

Gaggia Sup 037RG - Control Panel Display Guide; Ready and Warning Signals

Gaggia Sup 037RG
84 pages
Go to English
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
• 38 •• 38 •
The machine is performing the rinse
cycle.
Wait until the machine stops the
operation.
The machine needs a descaling cycle.
The machine needs water circuit
priming.
Warning Signals
The machine is warming up to brew
coee and dispense hot water or steam.
CONTROL PANEL
DISPLAY
Ready Signals
The machine is ready for brewing coee
from bean and hot water dispensing.
The machine is ready for pre-ground
coee brewing.
The machine is in the steam dispensing
phase.
The machine is in the hot water
dispensing phase.
The machine is brewing 1 espresso
coee or a long coee.
The machine is brewing 2 espresso
coees or 2 long coees.
The machine is programming the
amount of coee to be brewed each
time the or “ “ button is
pressed.
Steady on
Steady on
Steady on
Blinking
Steady on
Blinking
Cyclic blinking
Steady on
Steady on
Steady on
Blinking
4219-465-04381 GAG. MAN. BRERA IT-EN-DE-FR Rev.00.indd 38 14/10/2020 14:49:27

Related product manuals