EasyManua.ls Logo

Gardebruk 991468 User Manual

Gardebruk 991468
47 pages
Go to English
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
Stand 2020/10 Rev1
4 Raum-Gewächshaus
kelnummer
991461/991467
Deuba Serviceportal
Für jede Art Service, Reklamationen und technischen Support können Sie sich
vertrauensvoll an unsere geschulten Mitarbeiter wenden.
www.Deubaservice.de
Der direkte Weg zu unseren neusten Produkten, Angeboten und vieles
mehr!
www.DeubaXXL.de
Hergestellt für:
Deuba GmbH & Co. KG
Zum Wiesenhof 84
66663 Merzig
Germany
Made for:
Deuba LTD


IP24 1HB

Other manuals for Gardebruk 991468

Question and Answer IconNeed help?

Do you have a question about the Gardebruk 991468 and is the answer not in the manual?

Gardebruk 991468 Specifications

General IconGeneral
BrandGardebruk
Model991468
CategoryGreenhouse Kit
LanguageEnglish

Summary

INSTRUCTIONS

General Safety and Usage

Read safety and assembly instructions carefully. For domestic use only.

Assembly and Foundation

Pre-Assembly Preparation

Familiarize with rules, choose location, check parts, ensure level foundation.

Foundation Requirements

Prepare stable, level base; concrete foundation at least 10cm thick, or other materials.

Assembly Precautions

Important Assembly Tips

Do not fully tighten screws initially, avoid interruptions, keep away from fire.

Before Assembly Checklist

Ensure dry/wind-free day, sort parts, check tools, keep area clear.

Foundation Guide

Foundation Types and Measures

Details on strip foundations, dimensions, depth, and anchoring requirements.

Maintenance and Care

Routine Care and Winterizing

Use proper tools, replace damaged parts, clear roof of snow to prevent collapse.

Step-by-Step Assembly

Step 1: Base Frame Construction

Assemble the base frame using specific parts and fasteners.

Step 2: Side Panel Assembly

Construct side panels by connecting profiles and supports.

Step 3: Roof Structure Assembly

Build the main roof structure, connecting ridge and support beams.

Step 4: Front and Back Panel Assembly

Attach the front and back panels to the frame.

Step 5: Upper Frame and Panel Integration

Install the upper frame elements and associated panels.

Step 6: Diagonal Brace Installation

Secure the greenhouse structure with diagonal bracing elements.

Step 7: Joint Reinforcement

Reinforce key structural joints for added stability.

Step 8: Roof Panel Fitting

Install the roof panels and supporting hardware.

Step 9: Wall Panel Fitting and UV Protection

Mount wall panels, remove protective film, ensure correct UV side orientation.

Disposal and Recycling

End-of-Life Material Handling

Dispose of valuable raw materials responsibly for proper recycling.

Related product manuals