EasyManua.ls Logo

GE AKTA avant - Page 181

GE AKTA avant
538 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ActionStep
Connect a 25 to 30 ml syringe to the left purge valve of the selected system
pump. Make sure that the syringe fits tightly into the purge connector.
4
Open the purge valve by turning it counterclockwise about 3 quarters of a
turn. Draw 10 ml of liquid slowly into the syringe with a rate of about 1 ml
per second.
5
Close the purge valve by turning it clockwise. Disconnect the syringe and
discard its contents.
6
Repeat steps 3 to 5 for the other three purge valves of the system pumps
to get rid of air in all pump heads. Keep the system flow running during this
procedure.
7
Check that there is no air left in the pump by following the instructions in
Validate prime or purge of System Pump A or B or Sample Pump, on page172.
8
End the run
Click the End button in the System Control toolbar to end the run.
ÄKTA avant User Manual 29035184 AE 181
5 Operation
5.4 Prime inlets and purge pump heads
5.4.3 Prime Q inlets

Table of Contents

Other manuals for GE AKTA avant

Related product manuals