Step Action
1 Hang the gradient inlet manifold so that it is supported by the inlet valves
b
ut shifted back against the system.
2 Position and connect the gradient inlet manifold to the gradient pump
chamber inlet labeled IN with a TC clamp as illustrated below.
Install gradient jumper tubing
T
hese instructions are only relevant for the gradient setup.
5 Preparation
5.2 Install disposable flow kits
ÄKTA ready XL Operating Instructions 29281616 AE 105
*** TeDIS Valid on Date Printed Printed on: 15-09-2023 11:27:35 ***