EasyManua.ls Logo

GE AKTA ready XL - Page 106

GE AKTA ready XL
172 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Step Action
1 Locate the jumper tubing in the gradient section.
2 Connect the two pump head outlets, labeled O
UT, with the pump jumper
tubing using TC clamps.
Note:
T
he T-connection on the pump jumper tubing must be positioned closest to
the gradient pump.
5 Preparation
5
.2 Install disposable flow kits
106
ÄKTA ready XL Operating Instructions 29281616 AE
*** TeDIS Valid on Date Printed Printed on: 15-09-2023 11:27:35 ***

Table of Contents

Related product manuals