EasyManua.ls Logo

GE AKTA ready - Page 104

GE AKTA ready
227 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Set up for calibration
The set up for calibration procedure is run to ensure that no air bubbles are present in
the system tubings. A column should be connected to make the calibration conditions
similar to those of a real run.
ActionStep
Open the instructions box in the System Control module.1
Set the flow path in the instructions box under FlowPath, Inlet, Outlet, Air-
Trap, Column.
2
Use an appropriate inlet and outlet, set AirTrap to Bypass and Column to
Bypass.
3
Connect the inlet tubing to appropriate buffer vessels.4
Start pump A (%B = 0) with a ManFlow of 50%.5
Run the pump until the flow meter signal is stable.6
Start pump B (%B = 100) with a ManFlow of 50%.7
Run the pump until the flow meter signal is stable.8
104 ÄKTA ready Operating Instructions 28960345 AD
7 ÄKTA ready gradient
7.3 Calibrate and operate the ÄKTA ready gradient pump

Table of Contents

Related product manuals