Installation 1-1
September 2004
Introduction To ensure safe and reliable operation of the Model AT868 Flowmeter,
the system must be installed and programmed in accordance with the
guidelines established by GE Infrastructure Sensing engineers. Those
guidelines, explained in detail in this chapter, include the following
topics:
Unpacking the Model AT868 system
Selecting suitable sites for the electronics enclosure and the
flowcell/transducers
Installing the flowcell/transducers
Note: See the enclosed Liquid Transducer Installation Guide
(916-055) for detailed instructions on transducer installation.
Installing the electronics enclosure
Wiring the electronics enclosure
!WARNING!
Be sure to follow all applicable local safety codes and
regulations for installing electrical equipment. Consult
company safety personnel or local safety authorities to
verify the safety of any procedure or practice.
!ATTENTION EUROPEAN CUSTOMERS!
To meet CE Mark requirements, all cables must be installed
as described in Appendix B, CE Mark Compliance.