OPM_LPS_33E_10K_30K_4CN_V010.doc 57/82 Operating Manual LP 33 / 10-20-30 kVA
LP 33 20kVA
APPLICAT. ON UTILITY
4. Switch On the output switch Q1 (Pos. I).
The output will be supplied by the mains through the
bypass.
Verify, selecting the screen METERING/Udcp and Udcn,
that the booster voltage has reached about 400 VDC.
Udc Voltage
Udcp=400V Udcn=400V
> INVERTER ON ٭
INVERTER OFF
5. Switch On the inverter entering the screen:
MENU/COMMAND MENU/INVERTER ON
Some seconds later the load will be transferred on inverter
and the main screen will display: APPLICATION ON UPS
LP 33 20kVA
APPLICATION ON UPS
6. Operation mode selection.
LP 33 is delivered normally selected for permanent On-line operation.
IEM mode can be enabled and the IEM START time & IEM STOP time can be programmed
for each day of the week (see Section 7.3.1-5).
NOTE !
Even if the UPS is delivered with the battery fully charged, they could be
partially discharged during transportation or storage.
It is recommended to recharge the battery during a few hours in order to
provide the complete battery energy stored to the load in the event of mains
failure.