Customer Checklist
Discovery NM/CT 670 – Standard Integration Instructions
5483063-1EN, Rev.2, ©2015 GE Healthcare A-2
Table A-1: Deviation from Specifications in Site Preparation Manual
Description Personal Details
Floor and
anchoring
I hereby confirm that the site takes full responsibility for the
floor and anchoring methods differing from the specifications
in this manual
Name
Position
Signature
Table A-2: Site Preparation Timetable
Description Status See Comments
Scheduling
Project schedule verified with GE
3rd party vendors scheduled
Can meet the committed site ready date
Construction completion date matches delivery
date
Delivery date scheduled for
Installation dates scheduled for
Applications/Training date scheduled for
Site Ready date scheduled for
First Use date scheduled for