EasyManua.ls Logo

GE Discovery NM/CT 670 - Page 131

GE Discovery NM/CT 670
158 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Customer Checklist
Discovery NM/CT 670 – Standard Integration Instructions
5483063-1EN, Rev.2, ©2015 GE Healthcare A-5
Environmental
conditions
Ample working light is available for service
Air-conditioning meets requirements for system
thermal loads
Air-conditioning meets humidity requirements
Magnetic field in camera room is < 1 Gauss
Room is clean and free of dust, ready for installation
Room shielding
Shielding of scan room meets requirements
Shielding of operator room meets requirements
External exposure x-ray light installed
Safety Planned location of emergency button in scan room
is easily accessible by operator
Interlock system installed
Table A-3: Room Preparation (Continued)
Description Status See Comments
Customer-Provided
Cabling and Connections
Door switch
Warning lights
System Emergency Off button (SEO)
Additional wiring from MDP to PDU and UPS
available

Table of Contents

Related product manuals