EasyManua.ls Logo

GE Discovery NM/CT 670 - Default Chapter; Revision History

GE Discovery NM/CT 670
158 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Discovery NM/CT 670 – Standard Integration Instructions
5483063-1EN, Rev.2, ©2015 GE Healthcare ii
Revision History
Direction +
Revision
Date Description of Changes Chapter/
Pages
5483063_r2 April 2015
Updated to include Discovery NM/CT 670 ES in configurations with Optima CT scanners
(items indicated by D670/OPT) –see page xxii
Addition of IMPORTANT note to 1.3.1.2 Detector Head Precautions,p.1-6
Update of UPS specifications in:
Table 1-1: D670 Components and Clearance — Metric,p.1-10 and Table 1-3: D670
Components and Clearance — Imperial, p.1-13
Removal of CT Console table diagram from Chapter 1
New room layout Figure 2-9: D670/OPT Reduced Serviceability Configuration Room
Layout, p.2-15 & Section 2.2.2.1 on page 16
Update of Figure 2-10: Minimal Room Layout, p.2-17
Update of Figure 2-11: Recommended Layout, p.2-18
Update of UPS specifications in Table 2-2, Weight of Components, p.2-28
Update of Table 2-3, D670 Drilling and Anchor Chart,p.2-36
Update of Figure 2-21: Patient Table Pivot Floor-Plate Anchoring Holes, p.2-38
Update of 2.4 Seismic Requirements, p.2-46 and Table 2-5, Subsystem Centers of Gravity and
Anchoring Points,p.2-47
Addition of UPS to Table 4-2, D670 Heat Output in Scan Room,p.4-5
Update of Figure 5-3: MDP (A1) Connected to Power Input Distribution Box (PIDB) –
Configuration Options,p.5-14

Table of Contents

Related product manuals