Equipment Description and General Construction Requirements 2.3 Room Structural Requirements
2.3.1 Floor Requirements
Discovery NM/CT 670 – Standard Integration Instructions
5483063-1EN, Rev.2, ©2015 GE Healthcare 2-29
LEHR collimator 62 137 2 per system/cart
LEGP collimator 55 121 2 per system/cart
ELEGP collimator 62 137 2 per system/cart
MEGP collimator 103 227 2 per system/cart
HEGP collimator 131 288 2 per system/cart
NM UPS
May vary but no
more than 130
May vary but no
more than 287
4 feet
CT UPS (optional) 350 772 4 wheels; Anchored to floor
Xeleris workstation
(insignificant)
Table 2-2: Weight of Components(Continued)
Component
Weight (kg) Weight
(lb)
Load Distribution Comments
If the system is installed on a floor type thinner than a 166 mm (6.5") concrete floor, the customer shall,
at their expense, provide acceptable anchoring and mounting methods that meet all structural specifications
provided in sections 2.3.1.2 and 2.3.1.3 of this manual.
The customer shall ensure that the floor strength in the collimator cart storage area and along the movement
routes for collimator exchange are suitable for the collimator cart load (approx. 250 kg each).