17 K415 Issue No. 1
Leak Test (LEAK TEST) Task
A - External pressure source (indicator instruments only) B - Pressure regulator
C - Unit/system under test
If required, use the INPUT key to change pressure units.
Set-up the leak test WAIT and DURATION times to the required values as shown
below. Recommended minimum wait period - 3 minutes.
Close the vent valve and pressurize the unit/system to the required LEAK TEST
pressure.
•Press the RUN (F2) key to start the leak test. When completed, the beeper sounds
and the leak test results are written to the display.
bar
F2F1
DEMARRER
CHANGER
VALEUR
ATTENTE
DUREE
DEMARRER
PRESS. FIN
FUITE
TAUX FUITE
min
min
Bar
bar
bar
bar/m
3
1
C
A
B
FCT. : TESTFUITE 24V OFF
MODE ENREG. RAPIDE
DPI 615
CION
ATTENTE
DUREE
DEMARRER
PRESS. FIN
FUITE
3
TAUX FUITE
min
min
bar
bar
bar
bar/m
1
PRESSION INT
bar
DEMARRER
FCT. : TESTFUITE
MODE ENREG. RAPIDE
CION
ATTENTE
DUREE
DEMARRER
PRESS. FIN
FUITE
3
TAUX FUITE
min
min
bar
bar
bar
bar/m
1
PRESSION INT
bar
FCT. : TESTFUITE
MODE ENREG. RAPIDE
24V OFF 24V OFF
CHANGER
VALEUR
CHANGER
VALEUR
DEMARRER
REGLER
DUREE
REGLER
PERIODE
ATTENTE
Taking Measurements

Table of Contents

Related product manuals