EasyManua.ls Logo

GE Druck DPI612 - Priming Sequence

GE Druck DPI612
105 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
User Manual Druck DPI612
Page 49 of 105 [EN] English – 109M4017 Revision -
2.3.4 Priming Sequence
1 2 3 4
5 6 7 8
Step Procedure
1
Turn the Volume Adjuster counter-clockwise. (See Section
1.9.7)
2
Turn the Volume Adjuster 10 turns clockwise
3 Close Release Valve.
4
Close Refill Valve clockwise, finger tight (See Section 1.9.8).
5
Operate Priming Pump until liquid is seen coming from the
open test port / end of hose.
6 Connect IUT to open test port / end of hose.
7
Operate Priming Pump until pressure is indicated (max 10
bar)
8
Operate Volume Adjuster & Refill Valve to achieve required
pressure. (See Section 2.3.5)
Note: If priming a long hose keep the open end of hose vertical to
reduce trapping air.

Table of Contents

Related product manuals