EasyManua.ls Logo

GE Innova 3100 - 3 Grounding

GE Innova 3100
290 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3 Grounding
A vascular lab is a critical care area and requires a special grounding system for patient safety.
An equipotential grounding system is recommended for meeting patient safety requirements.
Reference: For general system grounding requirements and information on establishing an
equipotential grounding system, refer to:
Grounding Continuity
– Job card in the Installation
manual.
All shielded cables shall have a connection to ground at each extremity without
regard to the grounding to the scheme below.
Metallic covers on cable connectors shall be tested to ground.
Innova 2100-IQ, 3100/3100-IQ, 4100/4100-IQ Cardiovascular Imaging System Pre-Installation Manual
GE Healthcare Direction 5160944-13-1EN, Revision 2
178 3 Grounding

Table of Contents

Related product manuals