8
All walls primed (final coat not needed on
Day 1), and counter tops that will support
equipment must be installed. No dust-pro‐
ducing cabinetry work in installation areas.
X
9
Mechanical supplier has been provided
with a set of equipment installation draw‐
ings for reference. For California, permitted
construction drawings or PMI-specified in‐
stallation drawings are required.
X
X
X
X
10
Conduit/electrical cable ducting/dividers/
access flooring installed, with the excep‐
tion of surface-mounted floor ducting. Wir‐
ing to the main disconnect panel is instal‐
led and compliant with equipment
installation drawings or pre-installation
manual.
X
X
X
X
Issued Date: 7/9/07 Rev 11
GEHC Only: COE # (888) 799.7266 Option 5 (PMI Support)
Innova 2100-IQ, 3100/3100-IQ, 4100/4100-IQ Cardiovascular Imaging System Pre-Installation Manual
GE Healthcare Direction 5160944-13-1EN, Revision 2
250 5 Pre-Installation Checklist