4.2 Seismic Calculations
Seismic requirements are determined and specified by the hospital/ Design Professional of
record and may require approval by the specific state or country agency.
Seismic attachment hardware shown on seismic calculations may differ from hardware supplied
with system. Any additional hardware that is required will be the responsibility of the institution
and/or their contractor. Contact your local GE Installation Program Manager to obtain seismic
calculations.
Seismic calculations are per California Building Code (CBC) and International Building Code
(IBC).
The following shows center-of-gravity information for system components:
C1 cabinet, Illustration 2-87
C2 cabinet, Illustration 2-88
Fluoro UPS UL, Illustration 2-89
Fluoro UPS CE, Illustration 2-90
PDB UL, Illustration 2-91
PDB CE, Illustration 2-92
Tube Chiller Coolix 4100, Illustration 2-93
Detector Conditioner, Illustration 2-94
Omega IV Table, Illustration 2-95
Omega V Long Table, Illustration 2-96
Tilting table, Illustration 2-97
Gantry, Illustration 2-98
3 kVa UPS (LD option), Illustration 2-99
19” Desk Mounted Monitor, Illustration 2-100
Mavig Overhead Flat Panel Suspension, Illustration 2-101
Large Display Cabinet (LD option), Illustration 2-102
Large Display Monitor suspension (LD option),
Illustration 2-103
Large Display secondary monitor Swing out arm (LD option),
Illustration 2-104
Innova
TM
IGS 520, Innova
TM
IGS 530, Innova
TM
IGS 540 Pre-Installation Manual
Direction 5499972-1-1EN, Revision 2
Chapter 2 Equipment Requirements 165

Table of Contents

Related product manuals