EasyManua.ls Logo

GE Innova IGS 540 - 2.3 IVUS Wiring; 2.3.1 For IVUS rev 2 wiring; 2.3.2 For S5 I GE rev 2+ wiring

GE Innova IGS 540
244 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2.3 IVUS Wiring
2.3.1 For IVUS rev 2 wiring
The connection cables between the IVUS Control Room and Procedures Room components run
in a dedicated under floor conduit (see Cable Channelling).
A GND wire between the C1 cabinet and the IVUS Rev 2 CPU runs in the underfloor conduit
prepared for the Control Booth cables between Equipment Room and Control Room.
Illustration 5-15: IVUS rev 2 wiring
2.3.2 For S5I GE rev 2+ wiring
The connection cables between the S5I GE Control Room and Procedures Room components
run in a dedicated under floor conduit (see Cable Channeling).
Innova
TM
IGS 520, Innova
TM
IGS 530, Innova
TM
IGS 540 Pre-Installation Manual
Direction 5499972-1-1EN, Revision 2
222 2 System Cable Information

Table of Contents

Related product manuals