2.3 IVUS Wiring
2.3.1 For IVUS rev 2 wiring
The connection cables between the IVUS Control Room and Procedures Room components run
in a dedicated under floor conduit (see Cable Channelling).
A GND wire between the C1 cabinet and the IVUS Rev 2 CPU runs in the underfloor conduit
prepared for the Control Booth cables between Equipment Room and Control Room.
Illustration 5-15: IVUS rev 2 wiring
2.3.2 For S5I GE rev 2+ wiring
The connection cables between the S5I GE Control Room and Procedures Room components
run in a dedicated under floor conduit (see Cable Channeling).