A GND wire between the C1 cabinet and the S5I GE Rev 2+ Isolation Transformer runs in the
underfloor conduit prepared for the Control Booth cables between Equipment Room and Control
Room..
Illustration 5-16: S5I GE rev 2+ wiring
2.3.3 For IVUS rev 3 wiring
Refer to Volcano s5i Imaging System Integration in IGS Systems - Service Manual.
Innova
TM
IGS 520, Innova
TM
IGS 530, Innova
TM
IGS 540 Pre-Installation Manual
Direction 5499972-1-1EN, Revision 2
Chapter 5 Electrical Requirements 223