Figure 1-16
Step Two — Survey
Data concerning the intended delivery route are recorded on the Route Survey in the following pages.
Record all loading capacities, corridor widths, door openings, turning radii, flooring materials, elevator
sizes, obstructions and so on.
Step Three — Check
Verify equipment can be transported via the route specified in Step One — Sketch on page 23. Compare
Route Survey compiled in Step Two — Survey on page 24 to equipment specifications in this and other
applicable pre–installation directions.
Table 1-3
Route Survey
Ref. no. Area: loading dock, doorway, hallway, turn,
elevator, obstruction, etc.
Limitations: loading capacity, height, width,
depth flooring material, radius, etc.
General Requirements
24
Innova
TM
IGS 6