NOTE
Motion controls installed in remote location from the table shall be installed at a location
where all the positioner axis are visible by the operator.
Refer to Illustrations in 2.2.2.1 Patient Room Layout on page 72 to see possible exam / control rooms
layouts.
2.3 Room Structural Requirements
2.3.1 Floor Requirements
General Vascular GE Healthcare Policy
GE Healthcare’s Customer is responsible for the structural analysis and mounting of the base plates.
If GE Healthcare is forced to mount the base plate, the Local Customer Team must hire a structural
engineer to design and approve the mounting method and provide GE Healthcare with an
engineering report.
The floor level cannot exceed a general levelness of 5 mm (0.2 in) for any 2 meters (79 in).
NOTICE
The floor slabs on which the equipment is to be installed must have a levelness
of 1 mm (0.04 in) per meter (40 in). Position of baseplates and table basement
depends on the type of installation. The three types of installation are given in
Figure 2-43 on page 86.
Figure 2-43
The preferred installation method for the Innova Frontal and Lateral Positioner or the Omega tables is
through-bolting. The through-bolting method can be used in all seismic zones. If through-bolting cannot
be used, use provided floor anchors instead.