EasyManua.ls Logo

GE Sievers 500 RL - Step 1: Unpack and Inspect the Analyzer

GE Sievers 500 RL
186 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GE Analytical Instruments ©2010 46 of 226 DLM 74001-04 Rev. A
Chapter 3: Installation
Step 1: Unpack and Inspect the Analyzer
Open the shipping box and remove the Analyzer from the packaging. You may find it easiest to open the box and
remove the accessories tray, and then set the box on its side before removing the Analyzer from the box.
Next, verify that all items are present:
1. Sievers 500 RL On-Line TOC Analyzer
2. Operation and Maintenance Manual
3. Validation Support Package (VSP) Volume I
4. Sievers 500 RL Quick Start Guide
5. Accessories included:
1/4" sample inlet tubing with in-line filter (60 micron)
25/32" clamp for 3/4" waste tubing
3/4" OD tubing for waste line
Ferrite suppressor for use with 230 V configurations
9/16" open-end wrench
Double-ended screwdriver
•John Guest tool
Stainless steel metric tubing converter (1/4-in-to-6-mm tube)
Water bottle (250 mL) with nozzle for filling DI water reservoir
Tray (for draining DI water cartridge)
USB flash memory drive
PVC conduit connector (“strain relief” hubs) for conduit wiring
Sealing washer for PVC conduit connector
Terminal ring for AC conduit ground wire, 16-14 American Wire Gauge (AWG)
•Grounding wrist strap
•Keys (2)
Adhesive clips (2), for double-ended screwdriver and John guest fitting removal tool.
6. Certificate of Calibration
7. DataGuard activation key (optional)

Table of Contents

Related product manuals