EasyManua.ls Logo

GE Sievers 900 Series - Page 187

GE Sievers 900 Series
236 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GE Analytical Instruments ©2009 187 of 236 DLM 90488-01 Rev. A
22. Turn the Analyzer on with the main power switch.
23. Enter the installation date for the new resin bed. Press the Menu button, select the
Maintenance tab, press the Consumables button, press the New... button, and then press
the RBed button (see “Setting the Installation or Expiration Date for New Consumables” on
page 190 for additional details, if necessary).
24. Before resuming normal operation, check for leaks.
After resuming normal operation it may take up to four hours for the resin bed to rinse
down; during this time you may experience higher than normal IC values. If high IC values
persist, then you should perform a Conductivity Autozero; follow the instructions in
“Conductivity Autozero” on page 211.
25. After about 12 hours of operation, check the interior of the Analyzer for leaks, and add
water to the DI water reservoir, if necessary.

Table of Contents

Related product manuals