7-4 TONOPORT V Revision H
2001589-023
Firmware Loading Procedure for FW1.4: Loading Procedure
7.2 Loading Procedure
Connect inactive TONOPORT to PC COM port via serial cable.
Start Hyperterminal or Telix on the PC.
NOTE
After TONOPORT V has been switched on, updating can only be carried
out within the first 10 minutes. After 10 minutes TONOPORT V enters a
power down mode and can be reactivated by switching on and off.
Follow steps 1...6.
Step Action
Duration
(approx.)
Display
TONOPORT
V
PC Telix
Hyperterminal
PC monitor TONOPORT V LCD
1 Switch on
TONOPORT
V
8 seconds
8 seconds
TONOPORT V - V1.0*,
TONOPORT V - V1.1 or
TONOPORT V- V 1.2 or
TONOPORT V - V 1.3 /
"LANGUAGE"
TONOPORT V - V 1.4 /
"LANGUAGE"
HH:MM (time)
2
1
Transfer
ERASE.INT
2 seconds
2 seconds
LLLL (flashing)
3
1
Press
“START”
3 seconds
3 seconds
WAIT-BOOT.
2
0000
4 Transfer
BOOT14.PRG
50 seconds
25 seconds
BOOT-WRITE = OK
ERASE HAUPT UND DRUCK-PRG
LLLL (flashing)
5 Press “INFO” 11 seconds
11 seconds
ERASE-OK
WAIT-HAUPT.PRG VERSION 1.4
all segments ON
6 Transfer
HAUPT14.PR
G
10 minutes max. TONOPORT V-FW1.4/DEUTSCH HHLMM (time
1. Steps 2 and 3 are not applicable if V 1.3 or 1.4 is installed on TONOPORT V.
2. Note down the "LANGUAGE" (DEUTSCH, ENGLISH, FRANCAIS, ITALIANO, ESPAÑOL) which is installed on TONOPORT
V (Step1)