Revision A Transport Pro 9-11
2012659-042
Checkout: Recommended Tests and Checkout Procedures
Required Tools/Equipment
See the chart below for the equipment necessary to perform this checkout
procedure. Equivalent equipment may be substituted.
Power Test
All control panel indicators will illuminate until the power-up sequence
is complete. After approximately 10 seconds you should see a display.
1. Remove all batteries and unplug the monitor from the AC power
source to turn the monitor off.
2. Restore the batteries to the monitor and plug the monitor into the AC
power source to turn the monitor on.
3. Verify the monitor turns on and verify the DC power indicator is
illuminated.
4. Verify all of the control panel indicators illuminate on power up.
5. Verify the DC power indicator on the monitor stays illuminated.
NOTE
If the DC power indicator stays on, but the display is blank, the
monitor is likely in “standby mode” (battery charging). Press and
hold the Power button for approximately 0.25 seconds to enter
the normal mode.
If the DC power indicator is on, continue with the tests.
If either of the Charging Status indicators is yellow, wait for
the batteries to fully charge and the indicators to illuminate
Foot and battery door None None
Handle
Recommended Electrical Safety Tests and Checkout Procedures
Replacement or
Upgrade
Checkout Procedures Electrical Safety Tests
Item Manufacturer/Model
TRAM 100-851N module GE
Multifunctional Micro-simulator MARQ-III
Oscilloscope Tektronix 2215
External power supply GE
Known good battery GE
TRAM communication cable GE
Standard category 5 cross-over cable GE