EasyManua.ls Logo

GE Venue 50 - System Positioning;Transporting; Moving the System

GE Venue 50
327 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
System Positioning/Transporting
Venue 50Basic User Manual 2-21
Direction 5446729-100 English Rev. 7
System Positioning/Transporting
Moving the System
When moving or transporting the system, follow the precautions
below to ensure the maximum safety for personnel, the system,
and other equipment.
Before moving the system
1. Press the Power On/Off switch to power off the system.
2. Unplug the Docking Station/Cart power cord (if the system is
plugged in).
3. Release the Venue 50 from the Docking Station/Cart.
4. Store all probes in their original cases or in soft cloth or foam
to prevent from damage.
5. Store sufficient gel and other essential accessories in the
special storage case.

Table of Contents

Other manuals for GE Venue 50

Related product manuals