EasyManua.ls Logo

GE VIVID 3 BT00 - Page 216

GE VIVID 3 BT00
598 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GE MEDICAL SYSTEMS
D
IRECTION FK091075, REVISION 04 VIVID 3N PRO/EXPERT SERVICE MANUAL
6-4 Section 6-3 - Front End Voltages and Signal Indicators
Section 6-3 Front End Voltages and Signal Indicators (cont’d)
.
Figure 6-1 Front End Crate LEDs - RFT Configuration
The LEDs for each of the boards in the Front End Crate are summarized in the following subsections.
The LEDs are listed as viewed from the top of the board, when positioned in the Front End Crate.
NOTE: The front end voltages can be measured at the front of the Front Board (FB) using the voltage
test points.

Table of Contents

Related product manuals