EasyManua.ls Logo

GE VIVID 3 BT00 - Page 403

GE VIVID 3 BT00
598 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GE MEDICAL SYSTEMS
D
IRECTION FK091075, REVISION 04 VIVID 3N PRO/EXPERT SERVICE MANUAL
Chapter 8 Replacement Procedures 8-33
8-3-2-5 Installing a New VIC Correlation Box
NOTE: This procedure should be performed only when installing a Samsung 17" monitor, or
when replacing an existing VIC Correlation box!
NOTE: Before commencing this procedure, check that system has been disconnected from the mains power
as described in step 1 of 8-3-2-3 "Vivid 3 17" Monitor Removal - Procedure 1" on page 8-31.
1.) Remove the machine’s side covers see 8-2-2-3 "Side Covers Removal Procedure" on page 8-4
2.) Unscrew and remove the two screws located on the upper BEP bracket.
3.) Unscrew and remove the two screws located at the top of the bracket that connects the VIC
assembly to the metal frame - see Figure 8-34.
4.) Rotate the VIC sideways and pull out the VGA cable.
5.) Assemble the VIC correlation module and connect it to VGA OUT on the VIC module.
6.) Connect the cable to VIC correlation module and pass it through BEAM 3 energy chain and up into
the VGA box.
7.) Return the VIC to its original position above the BEP - see Figure 8-35.
Figure 8-34 VIC Assembly
Screws securing VIC bracket
Screw securing
VIC GND cable

Table of Contents

Related product manuals