EasyManua.ls Logo

GE VIVID 3 BT00 - Chapter 2 Pre-Installation; Overview

GE VIVID 3 BT00
598 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GE MEDICAL SYSTEMS
D
IRECTION FK091075, REVISION 04 VIVID 3N PRO/EXPERT SERVICE MANUAL
Chapter 2 Pre-Installation 2-1
Chapter 2
Pre-Installation
Section 2-1
Overview
2-1-1 Purpose of Chapter 2
This chapter provides the information required to plan and prepare for the installation of a Vivid 3N Pro/
Expert ultrasound unit. Included are descriptions of the electrical and facility requirements that must be
met by the purchaser. A worksheet is provided at the end of this chapter (see Figure 2-4 "Connectivity
Installation Worksheet" on page 2-11) to help ensure that all the required network information is
available, prior to installation.
Table 2-8 Contents in Chapter 2
SECTION DESCRIPTION PAGE NUMBER
2-1
Overview
2-1
2-2
Console Requirements
2-2
2-3
Facility Needs
2-7
2-4
Connectivity Installation Worksheet
2-11
2-5
Pre-Installation Check List
2-12

Table of Contents

Related product manuals