GE
P
ART NUMBER FN091065, REVISION 2 VS5 N AND VS6 N SERVICE MANUAL
Chapter 4 - Functional Checks 4-29
PRELIMINARY
5 Trackball to the Start button and press Set
The test commences.
When the ACW IQ Symmetry Test sequence is
complete, the View Test Log window opens
automatically, listing the test performed and showing
whether it passed or failed - see the example in Figure
7-37 on page 7-65.
6
Use the scroll arrows at the bottom of the Reports
window to scroll through the channels and view the
corresponding results.
ACW Matrix Test
1 Trackball to ACW Matrix Test and press Set.
2
Disconnect any probes currently connected to the
system and make sure that nothing is touching the probe
connectors.
3
Under the Special Instructions area, activate the Loops
checkbox and select the required number of Loops from
the combo box.
4
Adjacent to On Fail, select either Stop or Continue, as
required.
5 Trackball to the Start button and press Set
The test commences.
When the ACW Matrix Test sequence is complete, the
View Test Log window opens automatically, listing the
test performed and showing whether it passed or failed
- see the examples in Figure 7-39 on page 7-67 and
Figure 7-40 on page 7-69.
6
Use the scroll arrows at the bottom of the Reports
window to scroll through the channels and view the
corresponding results.
Table 4-12 Front End Tests (cont’d)
Step Task Expected Result(s)