GE
P
ART NUMBER FN091065, REVISION 2 VS5 N AND VS6 N SERVICE MANUAL
Chapter 7 - Diagnostics/Troubleshooting 7-35
PRELIMINARY
7-4-3-2 Full RFI Test (cont’d)
NOTE: For the Full RFI test, four tests are performed in the test sequence; these are listed in the Tests
window as shown in Figure 7-13. For each currently-selected test (for example, RFI FE Cache
Test) the corresponding report is listed in Reports on the right.
For details of each report, refer to the following explanations:
- Figure 7-15 "View Test Log - RFI Cache Test" on page 7-37
- Figure 7-19 "View Test Log - RFI Demodulator Short Test" on page 7-43
- Figure 7-17 "View Test Log - RFI Analog Circuits Test" on page 7-40
- Figure 7-21 "View Test Log - RFI Audio Test" on page 7-46
9) When done, trackball to the Exit button and press Set to close the View Report window.
10) After reviewing the test results, proceed as follows:
• If no problems were identified, it is recommended to re-boot the system (this is obligatory when
prompted).
• If no problems were identified but the problem persists, contact your local GE HEALTHCARE
field engineer for assistance.
• If errors were identified but the results were marginal, perform calibration, as described in
“DC Offset Calibration” on page 7-27, and then repeat the test.
• If errors were identified and the results were not marginal, verify that all system cables and
boards are connected (not misplaced) and functioning properly, as described in Chapter 5 -
Components and Function (Theory).
If the problem persists, this indicates that either the specific board you tested is faulty or that
another board that supports the operation of that board is faulty. Contact your local
GE HEALTHCARE field engineer for assistance.
11.)Trackball to the Exit button and press Set to close the View Test Log dialog box.
12.)Press the <Esc> button on the keyboard to close the Diagnostic Test Window.
7-4-3-3 RFI FE Cache Test
NOTE: For a description of this test, refer to the information provided in “RFI FE Cache Test” on page 7-12.
NOTE: When performing this test, no probe should be connected to the system and nothing should be touching
the probe connectors!
1.) In the Diagnostic Test window, trackball to RFI FE Cache Test in the list of RFI tests available for
selection from the Diagnostic Test Tree (see Figure 7-10 "CD Offset Verification Test" on page 7-
30) and press Set. The RFI FE Cache Test name is displayed under Execute; the relevant system
component to be tested remain highlighted light blue in the Schematic View (RFI), as shown below:
In order to access an individual board test, it is necessary to insert the service dongle from system boot-
up and enter the Service Password.